Permits & Rules

Boston building permit guide: short form vs long form, fees, lookup and inspections

Boston building permit guide: short form vs long form, ISD fees, the online portal, permit lookup by address, zoning review and inspections in Boston, MA.

Renovated sunroom with wood-paneled walls and ceiling

If you are planning work on a house or condo in Boston, the first question is which Boston building permit you need: a short form or a long form. The answer depends on whether your project changes the building's structure or use, and it decides your fee, your paperwork and how long review takes.

Here is the short version. Minor repairs and alterations go on a short form. Major renovations, structural changes, changes of occupancy and new buildings go on a long form, which needs stamped plans and a certified plot plan. Below I walk through fees, the portal, permit lookup by address, zoning, inspections, and how Boston compares with Somerville and Cambridge, where I do most of my work.

Short form vs long form Boston building permit

Both permits come from Boston's Inspectional Services Department (ISD). Here is how they compare, based on the city's short form permit page and long form permit page.

Short formLong form
Used forMinor alterations, repairs or replacements that do not change structure or use (for example, opening up a wall)Major alterations, changes to structure or use, change of occupancy, new construction
Fee$20 application fee plus $10 per $1,000 of estimated cost$50 application fee plus $10 per $1,000 of estimated cost
PlansDepends on the workStamped plans by a Massachusetts registered architect or engineer, plus a certified plot plan

The most common long form type is Long Form/Alteration/Change of Occupancy. The Erect/New Construction option is for a brand-new building. If you are not sure which one fits, ISD asks you to call before you file.

Who can apply, and how the online portal works

  • Homeowners can apply for work they do themselves on a 1–2 family, owner-occupied home.
  • Condo owners in a building with 3 or more units must hire a licensed contractor.
  • Contractors must apply in their own licensed name. The city says office staff or third parties cannot file for them.

Applications go through the ISD online permit portal. You create an account, pick the permit type and upload documents. One catch: once you submit, you cannot edit or add files until ISD reviews it, so upload everything the first time.

Boston building permit fees (and the double-fee rule)

Fees are based on your estimated cost of work and are due up front. Quick math for a $40,000 long form job: $50 + (40 x $10) = $450. The same job on a short form would be $420.

The rule people miss: do not start work before the permit is issued. Boston's permit pages say ISD may charge double the permit cost or issue a building code violation. The city's homeowner permit guide adds that you may also have to fix or remove unpermitted work.

Boston building permit lookup by address

Buying a house or checking a contractor's past work? There are a few ways to look up a Boston building permit:

  1. Current applications: use the city's Permit Finder to check status.
  2. Past permits: the historical permit records page links to an ISD document search and an open-data list of permits issued after December 15, 2009. All you need is the address.
  3. In person: ISD's office at 1010 Massachusetts Avenue, 5th floor. The city notes building plans can only be viewed there.

Zoning review, the ZBA and other approvals

Every permit gets checked against the Boston Zoning Code. If your project doesn't comply, you get a denial and can appeal to the Zoning Board of Appeal. Per the city's ZBA appeal page:

  • You must appeal within 45 days of your denial letter.
  • The fee is a $150 flat fee for residential buildings with three units or fewer.
  • The hearing date is published at least 20 days ahead.

Some projects also need sign-off from Parks and Recreation (work within 100 feet of a park or parkway) or the Landmarks Commission (historic districts). ISD will not request those for you. And if your property has no Record of Occupancy on file, the owner has to call ISD for a confirmation inspection first.

Inspections and closing the permit

  • Work must start within six months of issuance. Some project types can get a 180-day extension.
  • Schedule inspections through the portal or ISD at 617-635-5300. An inspector reaches out within 48 hours.
  • The licensed contractor must be on site.
  • After you pass, confirm the permit shows closed in the portal. An open permit can cause trouble when you sell.
Builder's tip: Before you file in Boston, pull the property's permit history and check for a Record of Occupancy. A missing occupancy record or an old open permit is the most common thing I see stall a project before review even starts.

How Boston differs from Somerville and Cambridge

The building code is the same statewide, but each city's process is different:

  • Somerville has one city portal for everything. You file a building permit in the Citizenserve portal and pay a review fee up front. Zoning relief and historic applications go through the same portal. Full walkthrough: my Somerville building permit guide.
  • Cambridge has its own portal, fees and zoning rules. See my Cambridge building permit guide.
  • Boston sends zoning denials to the ZBA through ISD's denial letter, and it requires stamped plans and a certified plot plan for every long form.

If you own a triple-decker or a 1900s two-family on the Boston–Somerville line, check which city your lot is actually in before you file anything.

Need a hand?

I handle permits for my clients across Greater Boston as a licensed Construction Supervisor, from choosing the right form to passing the last inspection. Book a free walkthrough and I'll send you a written line-item budget, usually within 48 hours.

Frequently asked questions

What is a short form building permit in Boston?

It is Boston ISD's permit for minor alterations, repairs or replacements that do not change a building's structure or use. The fee is $20 plus $10 per $1,000 of estimated cost.

How much is a long form building permit in Boston?

Boston charges a $50 application fee plus $10 per $1,000 of the estimated cost of work, paid up front. A $40,000 project works out to $450.

How do I look up building permits by address in Boston?

Use Boston's Permit Finder for current applications. For past permits, the city's historical permit records page links to an ISD document search and an open-data list of permits issued since December 15, 2009.

What happens if you start work before getting a permit in Boston?

Boston ISD may charge double the permit cost or issue a building code violation. You may also have to fix or remove the work.

See the towns I work in, with local permit notes, and how I price work.

Read this next

  1. Permits & RulesHow long does it take to get a building permit? Somerville and Massachusetts timingHow long does it take to get a building permit in Somerville? The 30-day Massachusetts rule, what slows reviews, hearing timelines and how to speed it up.4 min read · Keep reading →
  2. Hiring & PlanningHiring a contractor in Massachusetts: 8 checks before you signRegistration, licenses, the written contract, the deposit and who pulls the permit — what Massachusetts law expects, in plain English.3 min read · Keep reading →
  3. Permits & RulesWhat Happens If You Remodel Without a Permit in Massachusetts?What happens if you remodel without a permit in Somerville or elsewhere in Massachusetts: stop-work orders, triple fees, opened walls, how to fix it.4 min read · Keep reading →
  4. Costs & BudgetsGut Renovation Cost in Boston: What You're Really Paying ForWhat drives gut renovation cost in Boston, Somerville and Cambridge: demo, structure, new systems, energy code, lead, permits and avoiding surprises.4 min read · Keep reading →
  5. Permits & RulesCondo Renovation in Boston: Do You Need Permission to Renovate?Planning a condo renovation in Boston, Somerville or Cambridge? What your master deed and board control, permits, work hours and neighbor tips.4 min read · Keep reading →
  6. Hiring & PlanningRenovating in Medford, MA: a homeowner's guideHiring a general contractor in Medford, MA? How permits work at the Building Department, lead paint rules, license checks and a solid written contract.4 min read · Keep reading →

Have a question about your project?

Plans, a sketch or just an idea — talk to me. You'll get honest advice and a clear written budget and schedule.

Free: a 30-minute call or a walkthrough of your home.

Prefer to write? Send me your project details. I reply within one business day.

5.09 Google reviews

Worked with Magno & Co?

A 1-minute Google review helps Somerville neighbors find a builder they can trust, and it means a lot to a small local business.

Call Free consultation